System Development Charge Methodology Update as of 07-01-2024
System Development Charges (SDCs)
SDCs are a one time charge for new development. These fees are designed to recover the costs of infrastructure capacity needed to serve new development. Based on the State of Oregon Statute ORS 223.304, the charges are broken down into three components: 1) Reimbursement to recover existing facility capacity available for growth; 2) Improvement to recover planned capacity improvements for growth; and 3) Administration to recover direct costs.
All SDC fees will be adjusted annually on July 1 according to the West Region Consumer Price index [CPI-U) annual average as of December to account for changes in the costs acquiring and constructing facilities. The CPI-U as of December 2023 is 3.6%.
To access a custom SDC generator click here.
Scalable SDCs for Single Family Homes
The Scalable System Development Charges for Single Family Homes applies based on the living area of a single family home. "Living area" means the habitable floor area of a residential structure conforming to applicable building codes; typically this does not include the garage area, attic and/or basement areas, with substandard ceiling height or substandard egress.
Water SDC Schedule for a Single Family Home |
Square Feet |
Fixture Units |
Reimbursement SDC |
Improvement SDC |
Total SDC |
---|---|---|---|---|---|
Starting SDC per Single Family residence |
644 |
17.0000 |
$ 1,275.97 |
$ 6,513.84 |
$7,789.81 |
SDC Per Square Foot of a Single Family Residence |
1 |
0.0043 |
$0.32 |
$ 1.63 |
$ 1.95 |
Maximum SDC per Single Family Residence |
3,648 |
29.7887 |
$ 2,235.85 |
$ 11,414.06 |
$13,649.91 |
Wastewater SDC Schedule for a Single Family Home |
Square Feet |
Residents |
Reimbursement SDC |
Improvement SDC |
Total SDC |
---|---|---|---|---|---|
Starting SDC per Single Family Residence |
644 |
1.0000 |
$ 649.87 |
$ 1,343.61 |
$1,993.48 |
SDC per square foot of Single Family Residence |
1 |
0.0016 |
$ 1.00 |
$ 2.09 |
$ 3.10 |
Maximum SDC per Single Family Residence |
2,605 |
4.0475 |
$ 2,630.40 |
$ 5,438.32 |
$8,068.72 |
Transportation SDC Schedule for a Single Family Home |
Square Feet |
Residents |
Reimbursement SDC |
Improvement SDC |
Total SDC |
---|---|---|---|---|---|
Starting SDC per Single Family residence |
644 |
1.0000 |
$ 254.48 |
$ 1,256.70 |
$1,511.18 |
SDC per Square foot of Single Family Residence |
1 |
0.0016 |
$ 0.39 |
$ 1.96 |
$ 2.35 |
Maximum SDC per Single Family Residence |
2,605 |
4.0475 |
$ 1,030.03 |
$ 5,086.54 |
$6,116.58 |
Parks SDC Schedule for a Single Family Home |
Square Feet |
Residents |
Reimbursement SDC |
Improvement SDC |
Total SDC |
---|---|---|---|---|---|
Starting SDC per Single Family Residence |
644 |
1.0000 |
|
$ 2,507.88 |
$2,507.88 |
SDC per Square Foot of Single Family Residence |
1 |
0.0016 |
$3.90 |
$3.90 |
|
Maximum SDC per Single Family Residence |
2,605 |
4.0475 |
|
$ 10,150.77 |
$10,150.77 |
Stormwater SDC Schedule for a Single Family Home |
Reimbursement SDC |
Improvement SDC |
Total SDC |
||
---|---|---|---|---|---|
Per Square Foot |
|
|
$ 0.1676 |
$ 0.1450 |
$0.3127 |
Additions to Single Family Homes
Additions to Single Family Homes, including Accessory Dwelling Units are not exempt from System Development Charges. The above SDC per square foot applies to additions and ADUs where the resulting living area exceeds 1,834 square feet. Any square footage over 1,834 would incur the SDCs on a per square foot basis per the above tables for all SDCs.
Non-Scalable SDCs for all other System Development Charges
Meter Size |
Reimbursement Fee |
Improvement & Administrative Fee |
Total Fee |
---|---|---|---|
3/4" |
$ 1,553.00 |
$7,931.00 |
$9,483.00 |
1" |
$2,588.00 |
$ 13,218.00 |
$ 15,806.00 |
1.5" |
$ 5,177.00 |
$26,439.00 |
$ 31,616.00 |
2" |
$ 8,283.00 |
$42,302.00 |
$50,585.00 |
3" |
$15,530.00 |
$79,315.00 |
$94,845.00 |
4" |
$25,884.00 |
$132,192.00 |
$158,076.00 |
6" |
$51,768.00 |
$264,382.00 |
$316,150.00 |
8" |
$82,829.00 |
$423,011.00 |
$505,840.00 |
Meter Size |
Reimbursement Fee |
Improvement & Administrative Fee |
Total Fee |
---|---|---|---|
5/8" & 3/4" |
$ 1,739.00 |
$3,590.00 |
$5,329.00 |
1" |
$2,896.00 |
$5,984.00 |
$8,879.00 |
1.5" |
$5,790.00 |
$11,968.00 |
$17,758.00 |
2" |
$9,265.00 |
$19,146.00 |
$28,411.00 |
3" |
$18,528.00 |
$38,295.00 |
$56,824.00 |
4" |
$28,951.00 |
$59,835.00 |
$88,787.00 |
6" |
$57,902.00 |
$119,670.00 |
$177,572.00 |
8" |
$92,643.00 |
$191,474.00 |
$284,117.00 |
10" |
$144,755.00 |
$299,178.00 |
$443,933.00 |
12" |
$250,137.00 |
$516,980.00 |
$767,116.00 |
Meter Size |
Reimbursement Fee |
Improvement & Administrative Fee |
Total Fee |
---|---|---|---|
Per EDU |
$ 523.00 |
$481.00 |
$1,004.00 |
Per Sq. Ft. |
$ 0.1676 |
$ 0.1450 |
$ 0.3127 |
Customer Classification | Number of Dwelling Units | Reimbursement Fee | Improvement Fee | Total Fee |
---|---|---|---|---|
Multi-Family Dwelling Unit |
1 |
$0 |
$4,441.00 |
$4,441.00 |
Duplex |
2 |
$0 |
$8,884.00 |
$8,884.00 |
Triplex |
3 |
$0 |
$13,325.00 |
$13,325.00 |
Four-plex |
4 |
$0 |
$ 17,767.00 |
$17,767.00 |
Apartment Complex |
* |
* |
* |
* |
Condominium Complex |
* |
* |
* |
* |
Retirement/Assisted Living Complex |
* |
* |
* |
* |
Business- FTE |
- |
* |
$95.00 |
$95.00 |
*Multiply the number of dwelling units by the corresponding detached multi-family per dwelling fee component.
Land Use* | Improvement Fee | Reimbursement Fee | Compliance | Total Fee |
---|---|---|---|---|
Apartment |
$ 2,093.00 |
$ 449.00 |
$ 127.00 |
$2,669.00 |
General Office Building |
$5,089.00 |
$1,080.00 |
$306.00 |
$6,414.00 |
General Light Industrial |
$ 3,274.00 |
$702.00 |
$199.00 |
$4,175.00 |
High-Turnover (sit down restaurant) |
$ 13,214.00 |
$2,837.00 |
$803.00 |
$16,854.00 |
*These are the most common land-use applications; for a complete list of the ITE codes, contact the Community Development Department.